JTC1/SC22
N3191
From:___________________beginning of title
page____________________________________
ISO/IEC JTC 1/SC22
Programming languages, their environments and system software interfaces
Secretariat: U.S.A. (ANSI)
ISO/IEC JTC 1/SC22
N3191
TITLE: Resolutions of the SC 22/WG5 Meeting, 14-18 August 2000 in Finland
DATE ASSIGNED:
2000-11-02
SOURCE:
J. Reid, WG 5 Convener
BACKWARD POINTER:
N/A
DOCUMENT TYPE:
Meeting Resolutions
PROJECT NUMBER:
STATUS:
This document is forwarded to SC 22 members for information.
ACTION IDENTIFIER:
FYI to SC22 Member Bodies
DUE DATE:
N/A
DISTRIBUTION:
text
CROSS REFERENCE:
DISTRIBUTION FORM:
open
Lisa Rajchel
ANSI
11 West 42nd Street
New York, NY 10036
Telephone: (212) 642-4932
Fax: (212) 840-2298
Email: lrajchel@ansi.org <mailto:lrajchel@ansi.org>
___________________________end of title
page__________________________________
ISO/IEC JTC1/SC22/WG5 N1412
RESOLUTIONS OF THE WG5 MEETING
ON 14 TO 18 AUGUST 2000 IN OULU, FINLAND
David Muxworthy
Resolutions O1 to O11 were passed by unanimous consent, O12 and O13 by
unanimous acclaim.
O1. Convenor of WG5
That WG5 congratulates John Reid on his appointment as WG5 convenor by
SC22.
O2. SC22 e-mail lists
That WG5 directs its convenor to raise with SC22 the question of the
increasing unauthorized and irrelevant use of the SC22 e-mail lists.
O3. Circulation of Corrigenda and Current Working Draft
That WG5 thanks the primary development body for delivering the latest
draft standard and interpretation documents for this WG5 meeting as
requested in Cadarache resolution C6, and notes that in that
resolution "corrigendum" should have read "interpretation". WG5
especially thanks the Project Editor, Richard Maine, for producing the
draft standard so quickly following the latest meeting of the primary
development body.
O4. Requirements for Fortran 2000
That WG5 thanks the primary development body for progressing the
changes to the language specified in Cadarache resolution C1 and
approves WG5-N1413 as its updated specification of requirements for
Fortran 2000.
O5. Review of Fortran 2000 Draft Standard
That WG5 congratulates the primary development body on its work on
constructing the draft Fortran 2000 standard. Following a review of
the draft, WG5 endorses the following papers on various outstanding
issues:
WG5-N1402 and N1406 on interoperability with C
WG5-N1407 and N1417 on structure constructors and destructors
WG5-N1405 and N1408 on general editorial matters.
WG5 directs its convenor to forward these papers to the primary
development body before 4 September 2000 so that they may be available
at their next meeting.
O6. Revised schedule for Fortran 2000
That WG5 adopts the following minor changes to the schedule for the
revision of Fortran. Dates in 2002-06 and after are as contained in
Cadarache resolution C4.
J3 delivers to WG5 edits for draft corrigendum 1
and current working draft 2000-06
WG5 constructs corrigendum 1 2000-08
WG5 provides J3 with review of F2000 working draft 2000-08
Corrigendum 1 submitted for processing 2000-10
J3 delivers to WG5 edits for draft corrigendum 2
and current working draft 2001-06
WG5 constructs corrigendum 2 2001-08
WG5 provides J3 with review of F2000 working draft 2001-08
Corrigendum 2 submitted for processing 2001-10
J3 delivers proposed CD to WG5 2002-06
O7. Interpretations of Part 1 of the Fortran Standard
That WG5, following the letter ballot on interpretations to Part 1 of
the Fortran standard submitted to it by the primary development body
(papers WG5-N1390, N1392 and N1399), notes that the resolution of the
ballot is described in paper WG5-N1403 and that most items were
approved and progressed to the Technical Corrigendum stage while a few
were referred to the primary development body for further
consideration.
O8. Technical Corrigendum 1 for Part 1 of the Fortran Standard
That WG5 approves document WG5-N1416 as the initial draft Technical
Corrigendum to Part 1 of the Fortran standard and directs its convenor
to issue a typeset version for letter ballot by WG5 members.
O9. Maintenance of Part 1 of the Fortran Standard
That WG5 endorses papers WG5-N1404, N1410, N1411 and N1414 which
contain suggestions for progressing unresolved interpretation
requests, and directs its convenor to combine them into a single
document and to forward it to the primary development body before
4 September 2000 so that it may be considered at their next meeting.
O10. Maintenance of Part 3 of the Fortran Standard (Conditional
Compilation)
That WG5 thanks the Japanese and Russian member bodies for their
contributions on Part 3 of the Fortran standard and notes that the
standard is being reprinted by ISO to correct an omission in the first
edition, as described in WG5-N1409. Further WG5 endorses the proposed
corrections and clarifications to the standard which are described in
WG5-N1409 and intends that the modifications will be published in a
corrigendum in due course.
O11. Future Meetings
That WG5 thanks the British member body for offering to host the next
WG5 meeting, which will be held in London on 30 July to 3 August,
2001.
O12. Vote of Thanks for Support
That WG5 thanks the VTT (National Research Institute of Technology), its
Networking Research Department and the University of Oulu for so
generously supporting the meeting.
O13. Vote of Thanks
That WG5 wishes to express its appreciation to the convenor (John
Reid), the secretary (Jeanne Martin), the librarian (Larry Meadows),
the drafting committee, the host (Petri Mahonen) and other local
organizers (Katja Salmela and Kiia Hyyppa) for their contributions to
the success of the meeting.
WG5 wishes especially to thank the hosts for the excellent computing
facilities provided for the meeting.