From jwagener@amoco.com Mon May 17 03:49:15 1993
Received: from interlock.amoco.com by dkuug.dk with SMTP id AA22522
  (5.65c8/IDA-1.4.4j for <SC22WG5@dkuug.dk>); Mon, 17 May 1993 15:49:15 +0200
Received: by interlock.amoco.com id AA12282
  (InterLock SMTP Gateway 1.1 for SC22WG5@dkuug.dk);
  Mon, 17 May 1993 08:43:14 -0500
Received: by interlock.amoco.com (Internal Mail Agent-2);
  Mon, 17 May 1993 08:43:14 -0500
Received: by interlock.amoco.com (Internal Mail Agent-1);
  Mon, 17 May 1993 08:43:14 -0500
Date: Mon, 17 May 93 08:49:15 CDT
Message-Id: <9305171349.AA06812@trc.amoco.com>
From: Jerrold L. Wagener <jwagener@amoco.com>
To: SC22WG5@dkuug.dk
Subject: informal JLW report on X3J3 meeting 125
X-Charset: ASCII
X-Char-Esc: 29

informal JLW report of the 1993 May 10-14 X3J3 meeting
------------------------------------------------------

The principal objectives of this meeting were to (1) continue interpretation 
processing as a high priority, (2) review with X3H5 the draft X3H5 model 
binding to Fortran 90, and (3) prepare the initial X3J3 suggested 
requirements input to the WG5 revision requirements process.

At the beginning of the meeting there were 19 interpretation requests in 
X3J3/93-006r having a status of "X3J3 consideration in progress", 8 items 
returned from the X3J3 letter ballot, 7 items returned from the WG5 letter 
ballot, and one new request in the premeeting papers. At the end of the 
meeting 11 of these 35 items have status "X3J3 consideration in progress", 
17 have status "X3J3 draft response" and will be on the next X3J3 letter 
ballot, and the rest are "X3J3 approved; ready for WG5". In addition, 8 new 
requests were submitted at the meeting, all of which have status "X3J3 
consideration in progress", making a total of 19 of the now 139 items in 
X3J3/93-006r2 with this status. Thus the interpretation backlog at the end 
of the meeting is the same as at the beginning of the meeting, with a 
database that is 9 items larger.

The review of the X3H5 draft binding was completed, with a number of 
suggestions given to, and accepted by, X3H5 for revision of the draft. 
These include describing syntax and intrinsic procedures as in the Fortran 
standard, revising the examples, and shortening the draft by making more 
references to the model document and the Fortran standard (the binding is 
intended to be a "thin" binding anyway, rather than a "thick" one which is 
completely self-contained). In addition, X3J3 requests that the X3H5 model 
document and the Fortran 90 binding to it be processed together, including 
simultaneous public reviews.

The attention given to X3J3/93-004r, the database for suggested requirements, 
took two principal forms. One was to review the status of the 18 items 
originally in 004r and the other was addition of new items to the 004. 
Because this was the last chance to add items before the WG5 meeting, a 
flurry of activity resulted in 12 new items being added, all with status 
"registered" (status 1) and no further discrimination at this time; there 
will therefore be 30 items in 004r2, which will be submitted for the WG5 
meeting. Of the original 18 items, virtually all having status 1, seven were 
moved to status 6 (archival), meaning no further action recommended, and six 
were moved to status 3 (recommended to WG5 for a future revision). Status 3 
was further subdivided into 3a (recommended for the 1995 revision) and 3b  
(recommended for the 2000 revision); items 4, 15, and 16 were placed 
in 3a, items 12, 17, and 18 given 3b.

Jerry Wagener
1993 May 17