From dtm@tattoo.ed.ac.uk  Mon Feb 17 14:57:42 1997
Received: from haymarket.ed.ac.uk (haymarket.ed.ac.uk [129.215.128.53]) by dkuug.dk (8.6.12/8.6.12) with ESMTP id OAA23749 for <sc22wg5@dkuug.dk>; Mon, 17 Feb 1997 14:57:09 +0100
Received: from tattoo.ed.ac.uk (tattoo.ed.ac.uk [129.215.128.24]) by haymarket.ed.ac.uk (8.6.13/8.6.12) with SMTP id NAA01395 for <sc22wg5%dkuug.dk@haymarket.ed.ac.uk>; Mon, 17 Feb 1997 13:56:24 GMT
Date: 17 Feb 97  13:55:55 GMT
From: D Muxworthy <dtm@tattoo.ed.ac.uk>
Subject: WG5 resolutions from February 1997 meeting
To: sc22wg5@dkuug.dk
Message-ID:  <9702171355.aa21904@uk.ac.ed.tattoo>

Here are the resolutions from last week's WG5 meeting.  Several, notably
LV7, do not make sense without the referenced papers, which will appear
on the servers shortly.  All the recent papers referenced in the
resolutions have both WG5 and X3J3 numbers, which are:

N1237   97-108
N1243   97-111
N1259   97-138r2
N1261   97-142r2
N1263   97-139
N1265   97-135
N1266   97-137

                                             ISO/IEC JTC1/SC22/WG5-N1261

            RESOLUTIONS OF THE WG5/X3J3 JOINT MEETING
         ON FEBRUARY 10 TO 14 1997, IN LAS VEGAS, NEVADA

The meeting was attended by the convenor and 37 members, representing 7
member bodies.  Resolutions LV1, LV3 to LV6, LV8 and LV9 were approved
by unanimous consent,LV11 and LV12 by unanimous acclaim; votes on the
other resolutions are shown following each resolution. 

LV1. Technical Corrigendum 3 to Fortran 90
That WG5, as a result of comments made in the SC22 ballot (see
WG5-N1263), instructs the editor, John Reid, to make the alteration to
Technical Corrigendum 3 to Fortran 90 suggested by Japan and to forward
the resulting document to ITTF for publication. 

LV2.  Fortran 90 Binding to GKS
That WG5, having considered the objections raised by ISO/IEC JTC1/SC24
to the proposed cancellation of project 1.24.02.09 CD of GKS Fortran 90
Binding, requests JTC1 to allow this project to continue, for the
reasons already expressed by SC24. 
LV2 was approved with one individual abstention.

LV3.  Fortran 95 DIS
That WG5 instructs the editor, Richard Maine, to make the alteration to
DIS 1539- 1 suggested by Japan in its response to the SC22 ballot on
Technical Corrigendum 3 to IS 1539:1991, together with any editorial
changes requested by ITTF.  If there are no other suggested changes in
the DIS ballot, WG5 further instructs the editor to forward the
resulting document to ITTF for publication as soon as possible
thereafter.  If there are any additional changes suggested in comments
accompanying member body votes in the DIS ballot, WG5 instructs its
Convenor to distribute these comments to the members of WG5 as soon as
possible, and to conduct a letter ballot of member countries to
determine the action required with respect to these comments. 

LV4.  Interoperability with C
That WG5 instructs the project editor, Michael Hennecke, to modify the
draft PDTR, WG5-N1237, in accordance with the decisions of the
interoperability development body described in WG5-N1265, and to forward
the resulting document to its Convenor no later than March 17, 1997. 
WG5 further instructs its Convenor to forward the modified draft PDTR to
the SC22 Secretariat and to request that a first PDTR ballot be
conducted as soon as possible. 

LV5.  Internationalization
That WG5 thanks the Convenor of SC22/WG20, Arnold Winkler, for attending
the meeting and for presenting various issues related to
internationalization.  Further, WG5 resolves to address these issues
during the development of Fortran 2000. 

LV6.  Schedule for Fortran 2000 Revision
That WG5 revises the schedule defined in section 4.3 of its Strategic
Plan (WG5- N1151) as shown below, and further resolves that it will make
a more thorough revision of its Strategic Plan at the meeting in July
1997. 

 Stage      Process                                            Fortran 2000
     1      Initial requirements prepared                      1995-11
            Review of requirements completed                   1997-02
            Final definition of requirements                   1997-02
     2      Completion of separate edits                       1998-11
            First working draft available                      2000-01
            WG5 approval of draft CD                           2000-07
     3      First CD submitted for registration and approval   2000-08
            First CD ballot initiated                          2000-09
            First CD ballot comments available                 2001-01
            Final CD submitted for approval                    2001-08
            Final CD ballot initiated                          2001-09
            Final CD ballot comments available                 2002-02
            WG5 approval of draft DIS                          2002-03
     4      DIS registered                                     2002-05
            DIS ballot initiated                               2002-06
            DIS ballot results available                       2002-09
     5      Standard published                                 2002-11

LV7.  Content of Fortran 2000 Revision
That WG5 resolves that the content of Fortran 2000 be the items
specified in paper WG5-N1259. 
LV7 was approved with one individual abstention and one country
abstention, from Germany. 

LV8.  Letter Ballot on Part 3 of the Fortran Standard (Conditional
Compilation in Fortran)
That WG5, taking regard of the inconclusive nature of the discussions
and votes on the subject of conditional compilation at the meeting,
instructs its Convenor to convey the sense of the meeting to the project
editor, David Epstein, to summarize the relevant issues for the benefit
of members not present at the meeting and to carry out a letter ballot
of WG5 member bodies to confirm the continuation of the project. 

LV9.  Development of Part 3 of the Fortran Standard (Conditional
Compilation in Fortran)
That WG5, if appropriate following the letter ballot described in
resolution LV8, instructs the project editor, David Epstein, to modify
WG5-N1243 taking regard of the comments of the conditional compilation
development body described in WG5- N1266 and other comments received
from members of WG5, and to forward a copy of a revised draft CD to the
WG5 Convenor no later than June 16, 1997, in a form suitable for
submission for balloting by SC22, in order that it can be thoroughly
reviewed by WG5 before its meeting in Vienna on July 21-25, 1997. 

LV10. Future Meetings
That WG5 proposes to hold meetings in the next two years as follows:
      July 21-25, 1997              Vienna, Austria
      June or August, 1998          Trollhaettan, Sweden
LV10 was approved with two individual negative votes

LV11.  Vote of Thanks for Support for Meeting
That WG5 thanks X3J3 for generously supporting the meeting.

LV12.  Vote of Thanks
That WG5 wishes to express its appreciation to the WG5 Convenor (Miles
Ellis), the X3J3 Chair (Jerry Wagener), the secretary (Loren Meissner),
the librarian (Mallory North), the subgroup heads (Dick Hendrickson,
Stan Whitlock and Manuela Zuern), the drafting committee, the hosts and
particularly the local organizers Mallory North and Stan Whitlock for
their contribution to the success of the meeting. 
