From owner-sc22wg5@open-std.org  Mon Dec  8 11:21:00 2008
Return-Path: <owner-sc22wg5@open-std.org>
X-Original-To: sc22wg5-dom7
Delivered-To: sc22wg5-dom7@www2.open-std.org
Received: by www2.open-std.org (Postfix, from userid 521)
	id D0FFCC4596C; Mon,  8 Dec 2008 11:21:00 +0100 (CET)
X-Original-To: sc22wg5@open-std.org
Delivered-To: sc22wg5@open-std.org
Received: from gloin.rl.ac.uk (gloin.rl.ac.uk [130.246.135.201])
	by www2.open-std.org (Postfix) with ESMTP id 472D6C178D6
	for <sc22wg5@open-std.org>; Mon,  8 Dec 2008 11:20:58 +0100 (CET)
X-RAL-MFrom: <John.Reid@stfc.ac.uk>
X-RAL-Connect: <jkr.cse.rl.ac.uk [130.246.9.202]>
Received: from jkr.cse.rl.ac.uk (jkr.cse.rl.ac.uk [130.246.9.202])
	by gloin.rl.ac.uk (8.12.11.20060308/8.12.11) with ESMTP id mB8AKmi6027308
	(version=TLSv1/SSLv3 cipher=DHE-RSA-AES256-SHA bits=256 verify=NO);
	Mon, 8 Dec 2008 10:20:48 GMT
Received: from [127.0.0.1] (localhost.localdomain [127.0.0.1])
	by jkr.cse.rl.ac.uk (8.12.10/8.12.8) with ESMTP id mB8AKlWc030389;
	Mon, 8 Dec 2008 10:20:47 GMT
Message-ID: <493CF4FF.5010201@stfc.ac.uk>
Date: Mon, 08 Dec 2008 10:20:47 +0000
From: John Reid <John.Reid@stfc.ac.uk>
Reply-To: John.Reid@stfc.ac.uk
Organization: Rutherford Appleton Laboratory
User-Agent: Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.7.12) Gecko/20060209 Fedora/1.7.12-1.1.2.legacy
X-Accept-Language: en-us, en
MIME-Version: 1.0
To: WG5 <sc22wg5@open-std.org>
Subject: Re: [ukfortran] (SC22WG5.3753) May WG5/J3 meeting
References: <20081204110125.12A37CA5FE4@www2.open-std.org> <20081208073741.E4B33C178E5@www2.open-std.org>
In-Reply-To: <20081208073741.E4B33C178E5@www2.open-std.org>
Content-Type: text/plain; charset=us-ascii; format=flowed
Content-Transfer-Encoding: 7bit
X-CCLRC-SPAM-report: -1.44 : ALL_TRUSTED
X-Scanned-By: MIMEDefang 2.61 on 130.246.135.201
Sender: owner-sc22wg5@open-std.org
Precedence: bulk

TAKATA Masayuki wrote:
> WG5 and J3,
> 
> I very much appreciate it if the joint May meeting could be shifted to 
> the first
> week, i.e. 4-8 May, 2009.  Thank you for the reconsideration.

Van, I hear no objection to the change of date, so please make the contract for 
4-8 May.

John.

